GeoProof Field Command Twin™

Connect control, drone mapping, CAD/GIS handoff, staking readiness, field verification, and licensed review — one deterministic command surface.

What this is
A source-level, deterministic support surface for civil-workflow, survey-support workflow, drone mapping documentation, control network QA, CAD/GIS handoff readiness, staking readiness support, and field verification tracking. It does not determine legal boundaries, interpret deeds or plats, produce certified survey deliverables, or replace licensed civil engineers, licensed surveyors, or pilots. Legal boundary decisions are intentionally excluded and left to licensed professionals.
Overall GeoProof Field Readiness
60/100
Licensed surveyor review required for control network.
Status
review
Combined deterministic readiness across control, drone mapping, CAD/GIS handoff,
Score dimensions
8
Deterministic local scoring
Sample project
GeoProof Sample Corridor
gpfc-sample-001

Readiness score grid

Control Network Readiness

75/100

Review
CP-2: grid/ground scale note
Drone Mapping Documentation Readiness

90/100

Ready
MSN-2: pilot review pending
CAD/GIS Handoff Readiness

88/100

Ready
Proposed alignment: grid/ground scale note
Staking Package Readiness

46/100

Blocked
STK-2: elevation
Related: /construction
Field Verification Readiness

78/100

Review
FV-2: open issue
Related: /inspection
Licensed Review Readiness

20/100

Blocked
Licensed surveyor review required for control network.
Buyer Diligence Readiness

66/100

Review
Share the buyer-safe summary route with a technical reviewer.
Platform Handoff Readiness

20/100

Blocked
Fix the lowest-scoring dimension first.
Related: /proof

Control Network panel

  • Primary control CP-1 (licensed-surveyor)
    Field verified: true · CRS: true · Grid/ground: true · Source: true
    Licensed surveyor review required before legal use.
  • Secondary control CP-2 (survey-support-reviewer)
    Field verified: false · CRS: true · Grid/ground: false · Source: true
    Grid/ground scale note missing; field verification pending.
  • Auxiliary control CP-3 (survey-support-reviewer)
    Field verified: false · CRS: false · Grid/ground: false · Source: false
    CRS, source, and elevation missing.
  • Benchmarks/TBMs: BM-1, TBM-1 · GCPs/Checkpoints: GCP-1, GCP-2, CHK-1, CHK-2 · RTK/PPK: RTK-1, PPK-1

Drone-to-CAD/GIS panel

  • MSN-1 · 2026-07-01
    Pilot reviewed: true · GCPs: GCP-1, GCP-2 · Checkpoints: CHK-1 · Deliverables: ORTHO-1, DSM-1
    Not survey-grade; external validation required.
  • MSN-2 · 2026-07-05
    Pilot reviewed: false · GCPs: GCP-1 · Checkpoints: none · Deliverables: ORTHO-2
    Pilot review pending.
  • Existing surface (contours)
    Reviewer: cad-gis-reviewer · Mission: MSN-1 · Grid/ground: true
  • Proposed alignment
    Reviewer: civil-engineer · Mission: unlinked · Grid/ground: false

Staking Readiness panel

  • STK-1 · Curb return PC
    Coord:true · Elev:true · Sta/Off:true · Cut/Fill:true · Tolerance:true · Verified:false
    Civil engineer review required before field use.
  • STK-2 · Storm inlet rim
    Coord:true · Elev:false · Sta/Off:true · Cut/Fill:false · Tolerance:false · Verified:false
    Elevation, cut/fill, tolerance missing.
  • STK-3 · Sidewalk PT
    Coord:false · Elev:false · Sta/Off:false · Cut/Fill:false · Tolerance:false · Verified:false
    Point undocumented; not ready for handoff.

Field Verification panel

  • Control CP-1 field check
    Reviewer: survey-support-reviewer · Date: 2026-07-02 · Workflow: control-network · Evidence: CP-1 · Issue: resolved
  • GCP-2 field check
    Reviewer: drone-pilot · Date: 2026-07-06 · Workflow: drone-mission · Evidence: GCP-2 · Issue: open
  • STK-1 field walkthrough
    Reviewer: civil-engineer · Date: missing · Workflow: staking · Evidence: STK-1 · Issue: unspecified

Licensed Review Gate

  • Civil engineer review required for design layers, staking, cut/fill, and tolerance decisions.
  • Licensed surveyor review required for control network use and where staking accuracy matters.
  • Drone pilot review required for mission documentation and pilot-in-command sign-off.
  • CAD/GIS reviewer required for layer notes, CRS/datum/unit, and grid/ground scale.
  • Owner/admin and buyer/technical reviewer paths are also available on their respective routes.

GeoProof Blocker Assistant — What Blocks This Project?

Licensed Review Readiness: Licensed surveyor review required for control network.

Proof Passport (copy-ready Markdown)

# GeoProof Field Command Proof Passport

- Project: GeoProof Sample Corridor (gpfc-sample-001)
- Generated: 2026-07-10T00:00:00.000Z
- Overall readiness: 60/100 (review)

## Readiness scores
- Control Network Readiness: 75/100 (review) — CP-2: grid/ground scale note
- Drone Mapping Documentation Readiness: 90/100 (ready) — MSN-2: pilot review pending
- CAD/GIS Handoff Readiness: 88/100 (ready) — Proposed alignment: grid/ground scale note
- Staking Package Readiness: 46/100 (blocked) — STK-2: elevation
- Field Verification Readiness: 78/100 (review) — FV-2: open issue
- Licensed Review Readiness: 20/100 (blocked) — Licensed surveyor review required for control network.
- Buyer Diligence Readiness: 66/100 (review) — Share the buyer-safe summary route with a technical reviewer.
- Platform Handoff Readiness: 20/100 (blocked) — Fix the lowest-scoring dimension first.

## Control network
- Control points: 3
- Benchmarks/TBMs: 2
- GCPs/Checkpoints: 4
- RTK/PPK entries: 2

## Drone mapping documentation
- MSN-1 (2026-07-01): pilotReviewed=true, deliverables=2
- MSN-2 (2026-07-05): pilotReviewed=false, deliverables=1

## CAD/GIS handoff
- Existing surface (contours): reviewer=cad-gis-reviewer, mission=MSN-1
- Proposed alignment: reviewer=civil-engineer, mission=unlinked

## Staking readiness
- STK-1 Curb return PC: reviewer=civil-engineer
- STK-2 Storm inlet rim: reviewer=civil-engineer
- STK-3 Sidewalk PT: reviewer=civil-engineer

## Field verification
- FV-1: Control CP-1 field check (resolved)
- FV-2: GCP-2 field check (open)
- FV-3: STK-1 field walkthrough (unspecified)

## Licensed review requirements
- Licensed surveyor review required for control network.
- Civil engineer review required before staking field use.
- Drone pilot review required for missions.
- CAD/GIS reviewer required for layer notes.

## Limitations
- GeoProof Field Command Twin supports civil workflow, survey-support workflow, drone mapping documentation, control network QA, CAD/GIS handoff readiness, staking readiness support, and field verification tracking. It does not determine legal boundaries, interpret deeds or plats, produce certified survey deliverables, or replace licensed civil engineers, licensed surveyors, or pilots. Licensed professional review required where applicable.
- Legal boundary decisions intentionally excluded and left to licensed civil engineering / land surveying professionals.

Owner: All Over Aerial LLC.

Related workflows

Limitations
No legal boundary determination. No certified survey output. No licensed replacement claim. No legal staking approval. Professional review required. Pilot review required. External validation required. No customer, user, subscriber, revenue, ARR, or MRR claims.
Human review required · Not a substitute for licensed engineers, surveyors, or pilots
Extreme AI + Synthetic Intelligence v3
Extreme Intelligence Command Center

Deterministic-first AI orchestrator, synthetic scenarios (demo-only), workflow autopilot, next-best-action guidance, and human-review gates. Owned by All Over Aerial LLC.

Open Extreme Intelligence Command Center
Start here
Guided Start

Choose your role and goal. EKB will show the best path, explain each step, show what is blocked, and tell you what to do next. Owned by All Over Aerial LLC.

Open Guided Start